Projects
Achladotopos
“Achladotopos” wind farm, with 27,2 MW installed capacity and 25,8 MW maximum output capacity is located in the Municipality of Karystos, Regional Entity of Evia and consists of:
- Eight (8) Siemens SWT-108 – 3,4 MW wind turbines
- Control Building
Construction works were completed in December 2019 and the wind farm has been since operating, while the estimated yearly production amounts to 98 GWh.