EOLIKI ENERGEIAKI GKOURA S.A.

Energy production from renewable resources

 

 

 

Projects

Achladotopos
“Achladotopos” wind farm, with 27,2 MW installed capacity and 25,8 MW maximum output capacity is located in the Municipality of Karystos, Regional Entity of Evia and consists of:
  • Eight (8) Siemens SWT-108 – 3,4 MW wind turbines
  • Control Building

Construction works were completed in December 2019 and the wind farm has been since operating, while the estimated yearly production amounts to 98 GWh.